Skip to content

The building permit for the first structure of the Innovation Campus Freimann Munich was granted on 01.04.2020, exactly 6 months after the submission of the building application.

The building is mainly used for offices. A variety of office users are addressed via a flexible room and space concept. Open-space offices, cellular offices and mixed forms are all possible. At the same time, the development cores are arranged in such a way that both single-tenant and multi-tenant use is possible.

Eller + Eller Architekten have been commissioned by CA Immo Deutschland GmbH with the object planning in work phases 1 to 5 as well as the artistic supervision in work phase 8. The DGNB Gold certificate has been announced.

Innovation Campus, München

Weitere Meldungen

“Living Architecture” exhibition in Münster until 02.06.2022

The exhibition "Harald Deilmann - Living Architecture" can be seen in Münster until 02.06.2022. We have contributed to the exhibition catalogue, entitled "The Cultural Memory. From WestLB Dortmund to DoC - Dortmunder Centrum für Medizin und Gesundheit."
Mehr...

Jury chaired by Erasmus Eller selects winner in competition for BMW production location

The international architectural competition for the design of the new BMW production site in an urban environment has been decided. The jury, chaired by Erasmus Eller, chose two equal winners, OMA and 3XN, who will now jointly take over the planning. BMW presented the result to the public on 13.05.2022.
Mehr...

Future spaces through data-driven design

Future spaces through data-driven design. A practical report from our everyday design work. Lecture at digitalBAU 2022, 01.06.2022, Cologne Trade Fair Centre
Mehr...