Skip to content

Installation of the closed cavity façade at MIZAL

In Düsseldorf, assembly of the façade of the MIZAL Creative Campus WPP project planned by us has begun.

The closed-cavity façade (CCF) developed by Eller + Eller Architekten in collaboration with Gartner creates a lively light-and-shadow image through the geometry overlapping in scales.

The façade is structured by horizontal stripes at the level of the storey ceilings. The highly transparent façade offers the future user, the world’s leading advertising and media company WPP, a working environment with plenty of daylight that promotes communication.

Once completed, the closed-cavity façade will be the largest of its kind in Germany, covering an area of 17,640 sqm.

Further information on the façade can be found on the project page of Josef Gartner GmbH.

Our client Codic Development GmbH presents MIZAL on a separate project website

Weitere Meldungen

“Living Architecture” exhibition in Münster until 02.06.2022

The exhibition "Harald Deilmann - Living Architecture" can be seen in Münster until 02.06.2022. We have contributed to the exhibition catalogue, entitled "The Cultural Memory. From WestLB Dortmund to DoC - Dortmunder Centrum für Medizin und Gesundheit."
Mehr...

Jury chaired by Erasmus Eller selects winner in competition for BMW production location

The international architectural competition for the design of the new BMW production site in an urban environment has been decided. The jury, chaired by Erasmus Eller, chose two equal winners, OMA and 3XN, who will now jointly take over the planning. BMW presented the result to the public on 13.05.2022.
Mehr...

Future spaces through data-driven design

Future spaces through data-driven design. A practical report from our everyday design work. Lecture at digitalBAU 2022, 01.06.2022, Cologne Trade Fair Centre
Mehr...